A
Route GYSP
RailGympie North - Springfield
"Rock solid. This route barely misses a beat."
Route Report Card
How reliable is the GYSP?
Based on 4 trips over last 7 days
Grade A
Reliability
On-Time
100.0%
within window
Avg Delay
0.2 min
behind schedule
Trips
4
this week
Ghost Trips
0
never showed
Time Analysis
When to Ride
On-time performance by time of day
PMBEST
93.0%Route Map
Stop-by-Stop Reliability
Hover for details. Color shows on-time performance at each stop.
Loading map...
Bottleneck
Worst Stop on Route
Traveston station, platform 1
Based on 2,394 departures
40.9%
on-time
2,394
departures
Daily View
Day-by-Day Breakdown
Performance for each day this week
Date
Trips
On-Time
Delay
2026-06-01
1
100.0%
2.5m
2026-06-03
1
100.0%
-0.5m
2026-06-04
1
100.0%
-0.6m
2026-06-05
1
100.0%
-0.4m
90%+
Check Another Route
Get the report card for any SEQ route.