A
Route SHCL
RailShorncliffe - Cleveland
"Rock solid. This route barely misses a beat."
Route Report Card
How reliable is the SHCL?
Based on 266 trips over last 7 days
Grade A
Reliability
On-Time
99.2%
within window
Avg Delay
0.5 min
behind schedule
Trips
266
this week
Ghost Trips
0
never showed
Time Analysis
When to Ride
On-time performance by time of day
AM
97.6%PM
99.8%NightBEST
100.0%Route Map
Stop-by-Stop Reliability
Hover for details. Color shows on-time performance at each stop.
Loading map...
Daily View
Day-by-Day Breakdown
Performance for each day this week
Date
Trips
On-Time
Delay
2026-06-01
30
100.0%
0.2m
2026-06-02
52
96.2%
1.5m
2026-06-03
65
100.0%
0.2m
2026-06-04
59
100.0%
0.4m
2026-06-05
60
100.0%
Check Another Route
Get the report card for any SEQ route.